Maxim Engineering

Recent Work

Committed to Superior Quality and Results

AC Paving Maintenance

March ARB for 163d Attack Wing

Crack seal and install Type 1 slurry, striping and signage for private roads and parking lots; approx. 57k SF

AC Paving Maintenance

Avion II

Installation of sewer main.

Community Services District Sewer Treatment Plant

Fairbanks Ranch

Refabricated existing sewer pump station.

Installation of stainless steel aeration system.

MACC #6 Priority Sewer Group 16

Excavation of existing sewer line in alley.

Installation of new sewer line with replumbs to existing residences.

Remove and replace, reinstall concrete cap.

Excavation of existing sewer line in alley.

Merge 56

Refabricated existing sewer pump station.

Installation of Bio Clean structures.

Installation of Telco structure and conduit.
Installation of Bio Clean structures.

Installation of Bio Clean structures.

Installation of 4” high pressure gas line.

Phase 2A

Mid City Pipeline

Installation of 48” butterfly valve w/tees and stub.

Installation of 36” butterfly valve w/tees and stub.

Ralph W. Chapman
Reclamation Facility

Otay Water District

Demo existing aeration panels.

Installation of new aeration panels.

Aeration panel
replacement completed.

Community Services District Sewer Treatment Plant

Rancho Santa Fe

Installation of Muffin Monster.

Need An Engineering Contractor You Can Trust?