Recent Work
Committed to Superior Quality and Results
AC Paving Maintenance
March ARB for 163d Attack Wing
Crack seal and install Type 1 slurry, striping and signage for private roads and parking lots; approx. 57k SF
AC Paving Maintenance
Avion II
Installation of sewer main.
Community Services District Sewer Treatment Plant
Fairbanks Ranch
Refabricated existing sewer pump station.
Installation of stainless steel aeration system.
MACC #6 Priority Sewer Group 16
Excavation of existing sewer line in alley.
Installation of new sewer line with replumbs to existing residences.
Remove and replace, reinstall concrete cap.
Excavation of existing sewer line in alley.
Merge 56
Refabricated existing sewer pump station.
Installation of Bio Clean structures.
Installation of Telco structure and conduit.
Installation of Bio Clean structures.
Installation of Bio Clean structures.
Installation of 4” high pressure gas line.
Phase 2A
Mid City Pipeline
Installation of 48” butterfly valve w/tees and stub.
Installation of 36” butterfly valve w/tees and stub.
Ralph W. Chapman
Reclamation Facility
Otay Water District
Demo existing aeration panels.
Installation of new aeration panels.
Aeration panel
replacement completed.
Community Services District Sewer Treatment Plant
Rancho Santa Fe
Installation of Muffin Monster.