March ARB for 163d Attack Wing

AC Paving Maintenance

Crack seal and install Type 1 slurry, striping and signage for private roads and parking lots; approx. 57k SF

Avion II 

Del Sur

Avion Del Sur

Installation of sewer main.

Fairbanks Ranch

Community Services District Sewer Treatment Plant

Fairbanks Ranch Sewer 2

Refabricated existing sewer pump station.

Fairbanks Ranch Sewer 1

Installation of stainless steel aeration system.

MACC #6 Priority Sewer Group 16

MACC 6-1

Excavation of existing sewer line in alley.

MACC 6-3

Installation of new sewer line with replumbs to existing residences.

MACC 6-2

Remove and replace, reinstall concrete cap.

MACC 6-4

Bypass existing sewer and install new sewer.

Merge 56

Merge 56-1

Installation of Bio Clean structures.

Merge 56-3

Installation of Bio Clean structures.

Merge 56-5

Installation of electric structure and conduit.

Merge 56-2

Installation of Bio Clean structures.

Merge 56-4

Installation of Telco structure and conduit.

Merge 56-6

Installation of 4” high pressure gas line.

Mid City Pipeline

Phase 2A

Mid City Pipeline 1

Installation of 48” butterfly valve w/tees and stub.

Mid City Pipeline 2

Installation of 36” butterfly valve w/tees and stub.

Otay Water District

Ralph W. Chapman Reclamation Facility

Otay Water District 1

Demo existing aeration panels.

Otay Water District 3

Aeration panel replacement completed.

Otay Water District 2

Installation of new aeration panels.

Rancho Santa Fe

Community Services District Sewer Treatment Plant

Rancho Santa Fe CSDS

Installation of Muffin Monster.

Need An Engineering Contractor You Can Trust?

Maxim Construction Company, Inc.
dba Maxim Engineering

2107 Twisted Oak Lane
Alpine, CA 91901

CSLB A #1000689

Phone:
619.250.6369

Fax:
619.334.1880

Email:
info@maximcci.com