Recent Work
AC Paving Maintenance
March ARB for 163d Attack Wing
Avion II
Installation of sewer main.
Fairbanks Ranch
Refabricated existing sewer pump station.
Installation of stainless steel aeration system.
MACC #6 Priority Sewer Group 16

Excavation of existing sewer line in alley.

Installation of new sewer line with replumbs to existing residences.

Remove and replace, reinstall concrete cap.

Excavation of existing sewer line in alley.
Merge 56
Refabricated existing sewer pump station.
Installation of Bio Clean structures.
Installation of Bio Clean structures.
Installation of 4” high pressure gas line.
MID CITY PIPELINE PHASE 2A

Installation of 48” butterfly valve w/tees and stub.

Installation of 36” butterfly valve w/tees and stub.
RALPH W. CHAPMAN RECLAMATION FACILITY
Demo existing aeration panels.
Installation of new aeration panels.
Aeration panel
replacement completed.
Rancho Santa Fe
La Media Road Improvements
Las Colinas, Rancho Santa Fe
Otay 2nd Pipeline Phase 1




Merge 56
Refabricated existing sewer pump station.
Installation of Bio Clean structures.
Installation of Bio Clean structures.
Installation of 4” high pressure gas line.
Paradise Hills Improvements
Ralph W. Chapman
Reclamation Facility
Otay Water District
Installation of new aeration panels.
Aeration panel
replacement completed.
INSTALL IDS CONDUIT FOR THE 144TH FW DET-1 AT MARCH ARB
Camp Pendleton & Quantico Housing, LLC, 801 Military Housing Communities, Twentynine Palms, CA

(CNIC) NBC-2005 PS1351 PIPE REPLACEMENT, NASNI
