Maxim Engineering

Recent Work

Committed to Superior Quality and Results

AC Paving Maintenance

March ARB for 163d Attack Wing

Crack seal and install Type 1 slurry, striping.
Signage for private roads and parking lots; approx. 57k SF.

Avion II

Installation of sewer main.

Community Services District Sewer Treatment Plant

Fairbanks Ranch

Refabricated existing sewer pump station.

Installation of stainless steel aeration system.

MACC #6 Priority Sewer Group 16

Excavation of existing sewer line in alley.

Installation of new sewer line with replumbs to existing residences.

Remove and replace, reinstall concrete cap.

Excavation of existing sewer line in alley.

Merge 56

Refabricated existing sewer pump station.

Installation of Bio Clean structures.

Installation of Telco structure and conduit.
Installation of Bio Clean structures.

Installation of Bio Clean structures.

Installation of 4” high pressure gas line.

MID CITY PIPELINE PHASE 2A

Installation of 48” butterfly valve w/tees and stub.

Installation of 36” butterfly valve w/tees and stub.

OTAY WATER DISTRICT

RALPH W. CHAPMAN RECLAMATION FACILITY

Demo existing aeration panels.

Installation of new aeration panels.

Aeration panel
replacement completed.

Community Services District Sewer Treatment Plant

Rancho Santa Fe

Installation of Muffin Monster.

La Media Road Improvements

Installation of Fiber Optic Conduits.
Grade Storm Drain Swale.

Las Colinas, Rancho Santa Fe

Installation of 8” Water Line.

Otay 2nd Pipeline Phase 1

Merge 56

Refabricated existing sewer pump station.

Installation of Bio Clean structures.

Installation of Telco structure and conduit.
Installation of Bio Clean structures.

Installation of Bio Clean structures.

Installation of 4” high pressure gas line.

Paradise Hills Improvements

Installation of 8” Water Main, Fire Hydrants and Water Services.

Ralph W. Chapman
Reclamation Facility

Otay Water District

Demo existing aeration panels.

Installation of new aeration panels.

Aeration panel
replacement completed.

INSTALL IDS CONDUIT FOR THE 144TH FW DET-1 AT MARCH ARB

Micro tunneling to install intrusion detection system conduit.

Camp Pendleton & Quantico Housing, LLC, 801 Military Housing Communities, Twentynine Palms, CA

Ongoing Wastewater Operations and Maintenance Services.

(CNIC) NBC-2005 PS1351 PIPE REPLACEMENT, NASNI

Remove and Replace Existing Oily Waste Line, Awarded December 2024; In progress.

Need An Engineering Contractor You Can Trust?